Skip to content
LexBuild

Commission Information Collection Activities (FERC-725M); Comment Request; Extension

---
identifier: "/us/fr/2020-02895"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Commission Information Collection Activities (FERC-725M); Comment Request; Extension"
title_number: 0
title_name: "Federal Register"
section_number: "2020-02895"
section_name: "Commission Information Collection Activities (FERC-725M); Comment Request; Extension"
positive_law: false
currency: "2020-02-13"
last_updated: "2020-02-13"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Energy Department"
document_number: "2020-02895"
document_type: "notice"
publication_date: "2020-02-13"
agencies:
  - "Energy Department"
  - "Federal Energy Regulatory Commission"
fr_citation: "85 FR 8278"
fr_volume: 85
docket_ids:
  - "Docket No. IC19-32-000"
comments_close_date: "2020-03-16"
fr_action: "Notice of information collection and request for comments."
---

#  Commission Information Collection Activities (FERC-725M); Comment Request; Extension

**AGENCY:**

Federal Energy Regulatory Commission.

**ACTION:**

Notice of information collection and request for comments.

**SUMMARY:**

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725M (Mandatory Reliability Standards: Generator Requirements at the Transmission Interface) and submitting the information collection to the Office of Management and Budget (OMB) for review. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below.

**DATES:**

Comments on the collection of information are due by March 16, 2020.

**ADDRESSES:**

Comments filed with OMB, identified by the OMB Control No. 1902-0263, should be sent via email to the Office of Information and Regulatory Affairs: *[email protected].* Attention: Federal Energy Regulatory Commission Desk Officer.

A copy of the comments should also be sent to the Commission, in Docket No. IC19-32-000, by either of the following methods:

*eFiling at Commission's Website: http://www.ferc.gov/docs-filing/efiling.asp* .

*Mail/Hand Delivery/Courier:* Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426.

*Instructions:* All submissions must be formatted and filed in accordance with submission guidelines at: *http://www.ferc.gov/help/submission-guide.asp.* For user assistance contact FERC Online Support by email at *[email protected],* or by phone at: (866) 208-3676 (toll-free), or (202) 502-8659 for TTY.

*Docket:* Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at *http://www.ferc.gov/docs-filing/docs-filing.asp.*

**FOR FURTHER INFORMATION CONTACT:**

Ellen Brown may be reached by email at *[email protected],* by telephone at (202) 502-8663, and by fax at (202) 273-0873.

**SUPPLEMENTARY INFORMATION:**

*Title:* FERC-725M (Mandatory Reliability Standards: Generator Requirements at the Transmission Interface).

*OMB Control No.:* 1902-0263.

*Type of Request:* Three-year extension of the FERC-725M with no updates to the current reporting requirements.

*Abstract:* On August 27, 2019, the Commission published a Notice in the *Federal Register* in Docket No. IC19-32-000 requesting public comments. The Commission received no comments and noting that in the related submittal to OMB.

On September 19, 2013, the Commission issued Order No. 785, Docket No. RM12-16-000, a Final Rule [^1] approving modifications to four existing Reliability Standards submitted by the North American Electric Reliability Corporation (NERC), the Commission certified Electric Reliability Organization. Specifically, the Commission approved Reliability Standards FAC-001-1 (Facility Connection Requirements), FAC-003-3 (Transmission Vegetation Management), PRC-004-2.1a (Analysis and Mitigation of Transmission and Generation Protection System Misoperations), and  PRC-005-1.1b (Transmission and Generation Protection System Maintenance and Testing). [^2] The modifications improved reliability either by extending applicability of the Reliability Standard to certain generator interconnection facilities, or by clarifying that the existing Reliability Standard is and remains applicable to generator interconnection facilities.

[^1]*Generator Requirements at the Transmission Interface,* 144 FERC ¶ 61,221 (2013).

[^2] The burden is included in information collection FERC-725M.

The burdens related to previous versions of Reliability Standards mentioned in the Final Rule: FAC-001-0 (Facility Connection Requirements); FAC-003-2 (Transmission Vegetation Management); PRC-004-2a (Analysis and Mitigation of Transmission and Generation Protection System Misoperations); and PRC-005-1b (Transmission and Generation Protection System Maintenance and Testing) are included in FERC-725A (Mandatory Reliability Standards for the Bulk-Power System, OMB Control No. 1902-0244).

The Final Rule states the modifications included in PRC-004-2.1a and PRC-005-1.1b are clarifications of existing requirements, do not extend those existing requirements to any new entity or to additional facilities, and do not affect the existing burden related to those standards.

On April 26, 2016, a Delegated Letter Order was issued, Docket No. RD16-4-000, approving proposed Reliability Standard FAC-003-4 (Transmission Vegetation Management). Reliability Standard FAC-003-4 reflected revisions to the current Minimum Vegetation Clearance Distances (MVCDs) in Reliability Standard FAC-003-3 based on additional testing regarding the appropriate gap factor to be used to calculate clearance distances for vegetation. NERC explained that Reliability Standard FAC-003-4 includes higher and more conservative MVCD values and, therefore, maintained that these revisions would enhance reliability and provide additional confidence by applying a more conservative approach to determining the vegetation clearing distances. In FERC-725M we are:

(1) Adjusting the burden in FAC-003-4 to reflect the latest number of applicable entities based on the NERC Compliance Registry as of July 26, 2019.

(2) Making a program change to administratively remove all one-time burden [^3] that is being inadvertently counted in FERC-725M and FERC-725D.

[^3] One-time burden is typically performed in the first year of implementation. All burden associated with FAC-001-3 in this collection was removed in 2015. The burden in FAC-001-3 was transferred in 2015 to FERC-725D (OMB Control Number 1902-0247).

*See* the November 6, 2014 Delegated Letter Order, Docket No. RD14-12-000, approving Reliability Standard FAC-001-2 and Order No. 836, *Balancing Authority Control, Inadvertent Interchange, and Facility Interconnection Reliability Standards,* 160 FERC ¶ 61,070 (2017), approving Reliability Standard FAC-001-3.

*Type of Respondents:* Transmission Owner (TO); Generator Owner (GO); and Regional Entity (RE).

*Estimate of Annual Burden.*[^4] The Commission estimates the annual public reporting burden and cost [^5] for the information collection as:

[^4] Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a federal agency. *See* 5 CFR 1320 for additional information on the definition of information collection burden.

[^5] The estimated hourly cost (salary plus benefits) are based on the figures for May 2018 posted by the Bureau of Labor Statistics for the Utilities sector (available at *http://www.bls.gov/oes/current/naics2_22.htm* ) and updated March 2019 for benefits information (at *http://www.bls.gov/news.release/ecec.nr0.htm* ). The hourly estimates for salary plus benefits are:

—Manager (code 11-0000), $95.24

—Information and Records Clerks (code 43-4199), $40.84

—Electrical Engineer (code 17-2071), $68.17

The average hourly burden cost for this collection is $68.08 [($95.24 + $40.84 + $68.17)/3 = $68.08)] and is rounded to $68.00 an hour.

|  | Number of | Annual | Total number of responses | Average | Total annual burden hours & total annual cost | Cost per |
| --- | --- | --- | --- | --- | --- | --- |
|  | (1) | (2) | (1)*(2) = ( 3) | (4) | (3)*(4) = (5) | ($) (5) ÷ (1) |
|  |  |  |  |  |  |  |
| Generator Owners, Regional Entities: Quarterly Reporting (Compliance 1.4) | 101 | 4 | 404 | 0.25 hrs.; $17.00 | 101 hrs.; $6,868.00 | $68.00 |
| Generator Owners: Annual Veg. inspect. Doc. (M6); Work Plan (M7); Evidence of Mgt. of Veg. (M1 & M2); Confirmed Veg. Condition (M4); & Corrective Action (M5) | 95 | 1 | 95 | 2 hrs.; $136.00 | 190 hrs.; $12,920.00 | 136.00 |
| Generator Owners, Transmission Owners: Record Retention (Compliance 1.2) | 423 | 1 | 423 | 1 hr.; $68.00 | 423 hrs.; $28,764.00 | 68.00 |
| TOTAL |  |  | 922 |  | 714 hrs.: $48,552.00 | 272.00 |

*Comments:* Comments are invited on: (1) Whether  the collection of information  is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimates of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.

[^6] According to the NERC Compliance Registry as of July 26, 2019, there are 946 generator owners and 328 transmission owners registered in North America. We estimate that approximately 10 percent (or 95) of these generator owners have interconnection facilities that are applicable to the standard.

[^7] The estimated number of respondents (101) includes 95 generator owners and 6 Regional Entities.

Dated: February 3, 2020.

Kimberly D. Bose,

Secretary.