Skip to content
LexBuild

Pipeline Safety: Gas Pipeline Regulatory Reform; Correction

---
identifier: "/us/fr/2021-04576"
source: "fr"
legal_status: "authoritative_unofficial"
title: "Pipeline Safety: Gas Pipeline Regulatory Reform; Correction"
title_number: 0
title_name: "Federal Register"
section_number: "2021-04576"
section_name: "Pipeline Safety: Gas Pipeline Regulatory Reform; Correction"
positive_law: false
currency: "2021-03-05"
last_updated: "2021-03-05"
format_version: "1.1.0"
generator: "[email protected]"
agency: "Transportation Department"
document_number: "2021-04576"
document_type: "rule"
publication_date: "2021-03-05"
agencies:
  - "Transportation Department"
  - "Pipeline and Hazardous Materials Safety Administration"
cfr_references:
  - "49 CFR Part 192"
rin: "2137-AF36"
fr_citation: "86 FR 12835"
fr_volume: 86
docket_ids:
  - "Docket No. PHMSA-2018-0046"
  - "Amdt. No. 192-28"
effective_date: "2021-03-21"
fr_action: "Final rule; correction."
---

#  [Corrected]

**AGENCY:**

Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT).

**ACTION:**

Final rule; correction.

**SUMMARY:**

PHMSA is correcting its Gas Pipeline Regulatory Reform final rule that published in the *Federal Register* on January 11, 2021. The rule makes miscellaneous changes to the regulatory requirements for gas pipeline systems.

**DATES:**

This correction is effective March 21, 2021.

**FOR FURTHER INFORMATION CONTACT:**

Sayler Palabrica, Transportation Specialist, by telephone at 202-366-0559.

**SUPPLEMENTARY INFORMATION:**

PHMSA is correcting its Gas Pipeline Regulatory Reform final rule that published in the *Federal Register* on January 11, 2021 (86 FR 2210). PHMSA is correcting the amendatory instructions to 49 CFR 192.281 and appendix B to part 192. PHMSA is also correcting the new regulatory text at § 192.507(d) to remove the word “hydrostatic,” consistent with the unanimous recommendation of the Gas Pipeline Advisory Committee and the stated intent in the preamble of the final rule. [^1]

[^1] See 86 FR 2210 at page 2234.

**List of Subjects in 49 CFR Part 192**

Fire prevention, Incorporation by reference, Pipeline safety, Security measures.

**Corrections**

In FR Doc. 2021-00208 that appears on page 2210 of the *Federal Register* on Monday, January 11, 2021, the following corrections are made:

§ 192.281

**49 CFR Part 192**

1. On page 2240, in the second column, in part 192, in amendment 10, the instruction “In § 192.281, revise paragraph (c) to read as follow:” is corrected to read “In § 192.281, revise paragraph (c) introductory text to read as follows:”

**49 CFR Part 192**

2. On page 2241, in the third column, in amendatory instruction 17, paragraph (d) is corrected to read as follows:

§ 192.507

(d) For fabricated units and short sections of pipe, for which a post installation test is impractical, a preinstallation pressure test must be conducted in accordance with the requirements of this section.

**Appendix B to Part 192 [Corrected]**

**49 CFR Part 192**

3. On page 2242, in the third column, in part 192 in amendment 25, the instructions are corrected to read:

a. In section I.A., remove the term “ASTM D2513-12ae1” and add in its place “ASTM D2513”; and

b. In section I.B., remove the term “ASTM D2513-12ae1” and add in its place “ASTM D2513”.

Issued in Washington, DC, on March 1, 2021, under authority delegated in 49 CFR 1.97.

Tristan H. Brown,

Acting Administrator.