Skip to content
LexBuild

24 CFR § 3285.405 - Severe wind zones.

---
identifier: "/us/cfr/t24/s3285.405"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "24 CFR § 3285.405 - Severe wind zones."
title_number: 24
title_name: "Housing and Urban Development"
section_number: "3285.405"
section_name: "Severe wind zones."
chapter_name: "OFFICE OF ASSISTANT SECRETARY FOR HOUSING—FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT"
part_number: "3285"
part_name: "MODEL MANUFACTURED HOME INSTALLATION STANDARDS"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "42 U.S.C. 3535(d), 5403, 5404, and 5424."
regulatory_source: "72 FR 59362, Oct. 19, 2007, unless otherwise noted."
cfr_part: "3285"
---

# 3285.405 Severe wind zones.

When any part of a home is installed within 1,500 feet of a coastline in Wind Zones II or III, the manufactured home must be designed for the increased requirements, as specified on the home's data plate (refer to § 3280.5(f) of this chapter) in accordance with acceptable engineering practice. Where site or other conditions prohibit the use of the manufacturer's instructions, a registered professional engineer or registered architect, in accordance with acceptable engineering practice, must design anchorage for the special wind conditions.