Skip to content
LexBuild

24 CFR § 3285.6 - Final leveling of manufactured home.

---
identifier: "/us/cfr/t24/s3285.6"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "24 CFR § 3285.6 - Final leveling of manufactured home."
title_number: 24
title_name: "Housing and Urban Development"
section_number: "3285.6"
section_name: "Final leveling of manufactured home."
chapter_name: "OFFICE OF ASSISTANT SECRETARY FOR HOUSING—FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT"
part_number: "3285"
part_name: "MODEL MANUFACTURED HOME INSTALLATION STANDARDS"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "42 U.S.C. 3535(d), 5403, 5404, and 5424."
regulatory_source: "72 FR 59362, Oct. 19, 2007, unless otherwise noted."
cfr_part: "3285"
---

# 3285.6 Final leveling of manufactured home.

The manufactured home must be adequately leveled prior to completion of the installation, so that the home's performance will not be adversely affected. The home will be considered adequately leveled if there is no more than 
1/4 inch difference between adjacent pier supports (frame or perimeter) and the exterior doors and windows of the home do not bind and can be properly operated.