30 CFR § 250.1200 - Question index table.

---
identifier: "/us/cfr/t30/s250.1200"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "30 CFR § 250.1200 - Question index table."
title_number: 30
title_name: "Mineral Resources"
section_number: "250.1200"
section_name: "Question index table."
chapter_name: "BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR"
subchapter_number: "B"
subchapter_name: "OFFSHORE"
part_number: "250"
part_name: "OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334."
regulatory_source: "76 FR 64462, Oct. 18, 2011, unless otherwise noted."
cfr_part: "250"
---

# 250.1200 Question index table.

The table in this section lists questions concerning Oil and Gas Production Measurement, Surface Commingling, and Security.

| Frequently asked questions | CFR citation |
| --- | --- |
| 1. What are the requirements for measuring liquid hydrocarbons? | § 250.1202(a) |
| 2. What are the requirements for liquid hydrocarbon royalty meters? | § 250.1202(b) |
| 3. What are the requirements for run tickets? | § 250.1202(c) |
| 4. What are the requirements for liquid hydrocarbon royalty meter provings? | § 250.1202(d) |
| 5. What are the requirements for calibrating a master meter used in royalty meter provings? | § 250.1202(e) |
| 6. What are the requirements for calibrating mechanical-displacement provers and tank provers? | § 250.1202(f) |
| 7. What correction factors must a lessee use when proving meters with a mechanical displacement prover, tank prover, or master meter? | § 250.1202(g) |
| 8. What are the requirements for establishing and applying operating meter factors for liquid hydrocarbons? | § 250.1202(h) |
| 9. Under what circumstances does a liquid hydrocarbon royalty meter need to be taken out of service, and what must a lessee do? | § 250.1202(i) |
| 10. How must a lessee correct gross liquid hydrocarbon volumes to standard conditions? | § 250.1202(j) |
| 11. What are the requirements for liquid hydrocarbon allocation meters? | § 250.1202(k) |
| 12. What are the requirements for royalty and inventory tank facilities? | § 250.1202(l) |
| 13. To which meters do BSEE requirements for gas measurement apply? | § 250.1203(a) |
| 14. What are the requirements for measuring gas? | § 250.1203(b) |
| 15. What are the requirements for gas meter calibrations? | § 250.1203(c) |
| 16. What must a lessee do if a gas meter is out of calibration or malfunctioning? | § 250.1203(d) |
| 17. What are the requirements when natural gas from a Federal lease is transferred to a gas plant before royalty determination? | § 250.1203(e) |
| 18. What are the requirements for measuring gas lost or used on a lease? | § 250.1203(f) |
| 19. What are the requirements for the surface commingling of production? | § 250.1204(a) |
| 20. What are the requirements for a periodic well test used for allocation? | § 250.1204(b) |
| 21. What are the requirements for site security? | § 250.1205(a) |
| 22. What are the requirements for using seals? | § 250.1205(b) |