Title 30, Part 250 — Oil and Gas and Sulphur Operations in the Outer Continental Shelf
486 sections
Section 250.101
Authority and applicability.
Section 250.102
What does this part do?
Section 250.103
Where can I find more information about the requirements in this part?
Section 250.104
How may I appeal a decision made under BSEE regulations?
Section 250.105
Definitions.
Section 250.106
What standards will the Director use to regulate lease operations?
Section 250.107
What must I do to protect health, safety, property, and the environment?
Section 250.108
What requirements must I follow for cranes and other material-handling equipment?
Section 250.109
What documents must I prepare and maintain related to welding?
Section 250.110
What must I include in my welding plan?
Section 250.111
Who oversees operations under my welding plan?
Section 250.112
What standards must my welding equipment meet?
Section 250.113
What procedures must I follow when welding?
Section 250.114
How must I install, maintain, and operate electrical equipment?
Section 250.115
What are the procedures for, and effects of, incorporation of documents by reference in this part?
Section 250.116-250.117
§§ 250.116-250.117 [Reserved]
Section 250.118
Will BSEE approve gas injection?
Section 250.119
[Reserved]
Section 250.120
How does injecting, storing, or treating gas affect my royalty payments?
Section 250.121
What happens when the reservoir contains both original gas in place and injected gas?
Section 250.122
What effect does subsurface storage have on the lease term?
Section 250.123
[Reserved]
Section 250.124
Will BSEE approve gas injection into the cap rock containing a sulphur deposit?
Section 250.125
Service fees.
Section 250.126
Electronic payment instructions.
Section 250.130
Why does BSEE conduct inspections?
Section 250.131
Will BSEE notify me before conducting an inspection?
Section 250.132
What must I do when BSEE conducts an inspection?
Section 250.133
Will BSEE reimburse me for my expenses related to inspections?
Section 250.135
What will BSEE do if my operating performance is unacceptable?
Section 250.136
How will BSEE determine if my operating performance is unacceptable?
Section 250.140
When will I receive an oral approval?
Section 250.141
May I ever use alternate procedures or equipment?
Section 250.142
How do I receive approval for departures?
Section 250.143-250.144
§§ 250.143-250.144 [Reserved]
Section 250.145
How do I designate an agent or a local agent?
Section 250.146
Who is responsible for fulfilling leasehold obligations?
Section 250.150
How do I name facilities and wells in the Gulf of America Region?
Section 250.151
How do I name facilities in the Pacific Region?
Section 250.152
How do I name facilities in the Alaska Region?
Section 250.153
Do I have to rename an existing facility or well?
Section 250.154
What identification signs must I display?
Section 250.160-250.167
§§ 250.160-250.167 [Reserved]
Section 250.168
May operations or production be suspended?
Section 250.169
What effect does suspension have on my lease?
Section 250.170
How long does a suspension last?
Section 250.171
How do I request a suspension?
Section 250.172
When may the Regional Supervisor grant or direct an SOO or SOP?
Section 250.173
When may the Regional Supervisor direct an SOO or SOP?
Section 250.174
When may the Regional Supervisor grant or direct an SOP?
Section 250.175
When may the Regional Supervisor grant an SOO?
Section 250.176
Does a suspension affect my royalty payment?
Section 250.177
What additional requirements may the Regional Supervisor order for a suspension?
Section 250.180
What am I required to do to keep my lease term in effect?
Section 250.181-250.185
§§ 250.181-250.185 [Reserved]
Section 250.186
What reporting information and report forms must I submit?
Section 250.187
What are BSEE's incident reporting requirements?
Section 250.188
What incidents must I report to BSEE and when must I report them?
Section 250.189
Reporting requirements for incidents requiring immediate notification.
Section 250.190
Reporting requirements for incidents requiring written notification.
Section 250.191
How does BSEE conduct incident investigations?
Section 250.192
What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence?
Section 250.193
Reports and investigations of possible violations.
Section 250.194
How must I protect archaeological resources?
Section 250.195
What notification does BSEE require on the production status of wells?
Section 250.196
Reimbursements for reproduction and processing costs.
Section 250.197
Data and information to be made available to the public or for limited inspection.
Section 250.198
Documents incorporated by reference.
Section 250.199
Paperwork Reduction Act statements—information collection.
Section 250.200
Definitions.
Section 250.201
What plans and information must I submit before I conduct any activities on my lease or unit?
Section 250.202
How must I protect the rights of the Federal government?
Section 250.203
Are there special requirements if my well affects an adjacent property?
Section 250.204
Requirements for high pressure high temperature (HPHT) barrier equipment.
Section 250.205
[Reserved]
Section 250.206
What equipment does BSEE consider to be a barrier?
Section 250.207
How must barrier systems be used?
Section 250.208
How must I conduct activities under an approved EP, DPP, or DOCD?
Section 250.209
What must I do to conduct activities under the approved EP, DPP, or DOCD?
Section 250.210
Do I have to conduct post-approval monitoring?
Section 250.211
What are my new or unusual technology failure reporting requirements?
Section 250.212-250.219
§§ 250.212-250.219 [Reserved]
Section 250.220
What is the DWOP process?
Section 250.221
When must I use the DWOP process?
Section 250.222-250.224
§§ 250.222-250.224 [Reserved]
Section 250.225
What are the types of Conceptual Plans that I must submit?
Section 250.226
When and how must I submit each applicable Conceptual Plan?
Section 250.227
What must the Project Conceptual Plan contain?
Section 250.228
What must the New or Unusual Technology Conceptual Plan contain?
Section 250.229
What must the New or Unusual Technology Barrier Equipment Conceptual Plan include?
Section 250.230
When are you required to submit an I3P Report?
Section 250.231
What are your requirements for the Independent Third Party (I3P) nomination?
Section 250.232
What are the I3P review requirements for Conceptual Plan reviews?
Section 250.233
General requirements for any I3P Report.
Section 250.234
[Reserved]
Section 250.235
When and how must I submit the DWOP?
Section 250.236
What information must I submit with the DWOP?
Section 250.237
What general information must my DWOP include?
Section 250.238
What well or completions information must my DWOP include?
Section 250.239
What structural information must my DWOP include?
Section 250.240
What production safety system information must my DWOP include?
Section 250.241
What subsea systems and pipeline information must my DWOP include?
Section 250.242
What New or Unusual Technology information must my DWOP include?
Section 250.243-250.244
§§ 250.243-250.244 [Reserved]
Section 250.245
May I combine the Project Conceptual Plan and the DWOP?
Section 250.246
When must I revise my DWOP?
Section 250.247
When must I supplement my DWOP?
Section 250.248
What information must I include in my Supplemental DWOP?
Section 250.300
Pollution prevention.
Section 250.301
Inspection of facilities.
Section 250.400
General requirements.
Section 250.401-250.403
§§ 250.401-250.403 [Reserved]
Section 250.404
What are the requirements for the crown block?
Section 250.405
What are the safety requirements for diesel engines used on a drilling rig?
Section 250.406
[Reserved]
Section 250.407
What tests must I conduct to determine reservoir characteristics?
Section 250.408
May I use alternative procedures or equipment during drilling operations?
Section 250.409
May I obtain departures from these drilling requirements?
Section 250.410
How do I obtain approval to drill a well?
Section 250.411
What information must I submit with my application?
Section 250.412
What requirements must the location plat meet?
Section 250.413
What must my description of well drilling design criteria address?
Section 250.414
What must my drilling prognosis include?
Section 250.415
What must my casing and cementing programs include?
Section 250.416
What must I include in the diverter description?
Section 250.417
[Reserved]
Section 250.418
What additional information must I submit with my APD?
Section 250.420
What well casing and cementing requirements must I meet?
Section 250.421
What are the casing and cementing requirements by type of casing string?
Section 250.422
When may I resume drilling after cementing?
Section 250.423
What are the requirements for casing and liner installation?
Section 250.424-250.426
§§ 250.424-250.426 [Reserved]
Section 250.427
What are the requirements for pressure integrity tests?
Section 250.428
What must I do in certain cementing and casing situations?
Section 250.430
When must I install a diverter system?
Section 250.431
What are the diverter design and installation requirements?
Section 250.432
How do I obtain a departure to diverter design and installation requirements?
Section 250.433
What are the diverter actuation and testing requirements?
Section 250.434
What are the recordkeeping requirements for diverter actuations and tests?
Section 250.440-250.451
§§ 250.440-250.451 [Reserved]
Section 250.452
What are the real-time monitoring requirements for Arctic OCS exploratory drilling operations?
Section 250.455
What are the general requirements for a drilling fluid program?
Section 250.456
What safe practices must the drilling fluid program follow?
Section 250.457
What equipment is required to monitor drilling fluids?
Section 250.458
What quantities of drilling fluids are required?
Section 250.459
What are the safety requirements for drilling fluid-handling areas?
Section 250.460
What are the requirements for conducting a well test?
Section 250.461
What are the requirements for directional and inclination surveys?
Section 250.462
What are the source control, containment, and collocated equipment requirements?
Section 250.463
Who establishes field drilling rules?
Section 250.465
When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE?
Section 250.466-250.469
§§ 250.466-250.469 [Reserved]
Section 250.470
What additional information must I submit with my APD for Arctic OCS exploratory drilling operations?
Section 250.471
What are the requirements for Arctic OCS source control and containment?
Section 250.472
What are the relief rig requirements for the Arctic OCS?
Section 250.473
What must I do to protect health, safety, property, and the
environment while operating on the Arctic OCS?
Section 250.490
Hydrogen sulfide.
Section 250.500
General requirements.
Section 250.501
Definition.
Section 250.502
[Reserved]
Section 250.503
Emergency shutdown system.
Section 250.504
Hydrogen sulfide.
Section 250.505
Subsea completions.
Section 250.506-250.508
§§ 250.506-250.508 [Reserved]
Section 250.509
Well-completion structures on fixed platforms.
Section 250.510
Diesel engine air intakes.
Section 250.511
Traveling-block safety device.
Section 250.512
Field well-completion rules.
Section 250.513
Approval and reporting of well-completion operations.
Section 250.514
Well-control fluids, equipment, and operations.
Section 250.515-250.517
§§ 250.515-250.517 [Reserved]
Section 250.518
Tubing and wellhead equipment.
Section 250.519
What are the requirements for casing pressure management?
Section 250.520
How often do I have to monitor for casing pressure?
Section 250.521
When do I have to perform a casing diagnostic test?
Section 250.522
How do I manage the thermal effects caused by initial production on a newly completed or recompleted well?
Section 250.523
When do I have to repeat casing diagnostic testing?
Section 250.524
How long do I keep records of casing pressure and diagnostic tests?
Section 250.525
When am I required to take action from my casing diagnostic test?
Section 250.526
What do I submit if my casing diagnostic test requires action?
Section 250.527
What must I include in my notification of corrective action?
Section 250.528
What must I include in my casing pressure request?
Section 250.529
What are the terms of my casing pressure request?
Section 250.530
What if my casing pressure request is denied?
Section 250.531
When does my casing pressure request approval become invalid?
Section 250.600
General requirements.
Section 250.601
Definitions.
Section 250.602
[Reserved]
Section 250.603
Emergency shutdown system.
Section 250.604
Hydrogen sulfide.
Section 250.605
Subsea workovers.
Section 250.606-250.608
§§ 250.606-250.608 [Reserved]
Section 250.609
Well-workover structures on fixed platforms.
Section 250.610
Diesel engine air intakes.
Section 250.611
Traveling-block safety device.
Section 250.612
Field well-workover rules.
Section 250.613
Approval and reporting for well-workover operations.
Section 250.614
Well-control fluids, equipment, and operations.
Section 250.615-250.618
§§ 250.615-250.618 [Reserved]
Section 250.619
Tubing and wellhead equipment.
Section 250.620
Wireline operations.
Section 250.700
What operations and equipment does this subpart cover?
Section 250.701
May I use alternate procedures or equipment during operations?
Section 250.702
May I obtain departures from these requirements?
Section 250.703
What must I do to keep wells under control?
Section 250.710
What instructions must be given to personnel engaged in well operations?
Section 250.711
What are the requirements for well-control drills?
Section 250.712
What rig unit movements must I report?
Section 250.713
What must I provide if I plan to use a mobile offshore drilling unit (MODU) for well operations?
Section 250.714
Do I have to develop a dropped objects plan?
Section 250.715
Do I need a global positioning system (GPS) for all MODUs?
Section 250.720
When and how must I secure a well?
Section 250.721
What are the requirements for pressure testing casing and liners?
Section 250.722
What are the requirements for prolonged operations in a well?
Section 250.723
What additional safety measures must I take when I conduct operations on a platform that has producing wells or has other hydrocarbon flow?
Section 250.724
What are the real-time monitoring requirements?
Section 250.730
What are the general requirements for BOP systems and system components?
Section 250.731
What information must I submit for BOP systems and system components?
Section 250.732
What are the independent third party requirements for BOP systems and system components?
Section 250.733
What are the requirements for a surface BOP stack?
Section 250.734
What are the requirements for a subsea BOP system?
Section 250.735
What associated systems and related equipment must all BOP systems include?
Section 250.736
What are the requirements for choke manifolds, kelly-type valves inside BOPs, and drill string safety valves?
Section 250.737
What are the BOP system testing requirements?
Section 250.738
What must I do in certain situations involving BOP equipment or systems?
Section 250.739
What are the BOP maintenance and inspection requirements?
Section 250.740
What records must I keep?
Section 250.741
How long must I keep records?
Section 250.742
What well records am I required to submit?
Section 250.743
What are the well activity reporting requirements?
Section 250.744
What are the end of operation reporting requirements?
Section 250.745
What other well records could I be required to submit?
Section 250.746
What are the recordkeeping requirements for casing, liner, and BOP tests, and inspections of BOP systems and marine risers?
Section 250.750
What are the coiled tubing requirements?
Section 250.751
Coiled tubing testing requirements.
Section 250.760
What are the snubbing requirements?
Section 250.800
General.
Section 250.801
Safety and pollution prevention equipment (SPPE) certification.
Section 250.802
Requirements for SPPE.
Section 250.803
What SPPE failure reporting procedures must I follow?
Section 250.804
[Reserved]
Section 250.805
Hydrogen sulfide.
Section 250.806-250.809
§§ 250.806-250.809 [Reserved]
Section 250.810
Dry tree subsurface safety devices—general.
Section 250.811
Specifications for SSSVs—dry trees.
Section 250.812
Surface-controlled SSSVs—dry trees.
Section 250.813
Subsurface-controlled SSSVs.
Section 250.814
Design, installation, and operation of SSSVs—dry trees.
Section 250.815
Subsurface safety devices in shut-in wells—dry trees.
Section 250.816
Subsurface safety devices in injection wells—dry trees.
Section 250.817
Temporary removal of subsurface safety devices for routine operations.
Section 250.818
Additional safety equipment—dry trees.
Section 250.819
Specification for surface safety valves (SSVs).
Section 250.820
Use of SSVs.
Section 250.821
Emergency action and safety system shutdown—dry trees.
Section 250.822-250.824
§§ 250.822-250.824 [Reserved]
Section 250.825
Subsea tree subsurface safety devices—general.
Section 250.826
Specifications for SSSVs—subsea trees.
Section 250.827
Surface-controlled SSSVs—subsea trees.
Section 250.828
Design, installation, and operation of SSSVs—subsea trees.
Section 250.829
Subsurface safety devices in shut-in wells—subsea trees.
Section 250.830
Subsurface safety devices in injection wells—subsea trees.
Section 250.831
Alteration or disconnection of subsea pipeline or umbilical.
Section 250.832
Additional safety equipment—subsea trees.
Section 250.833
Specification for underwater safety valves (USVs).
Section 250.834
Use of USVs.
Section 250.835
Specification for all boarding shutdown valves (BSDVs) associated with subsea systems.
Section 250.836
Use of Bsdvs.
Section 250.837
Emergency action and safety system shutdown—subsea trees.
Section 250.838
What are the maximum allowable valve closure times and hydraulic bleeding requirements for an electro-hydraulic control system?
Section 250.839
What are the maximum allowable valve closure times and hydraulic bleeding requirements for a direct-hydraulic control system?
Section 250.840
Design, installation, and maintenance—general.
Section 250.841
Platforms.
Section 250.842
Approval of safety systems design and installation features.
Section 250.843-250.849
§§ 250.843-250.849 [Reserved]
Section 250.850
Production system requirements—general.
Section 250.851
Pressure vessels (including heat exchangers) and fired vessels.
Section 250.852
Flowlines/Headers.
Section 250.853
Safety sensors.
Section 250.854
Floating production units equipped with turrets and turret-mounted systems.
Section 250.855
Emergency shutdown (ESD) system.
Section 250.856
Engines.
Section 250.857
Glycol dehydration units.
Section 250.858
Gas compressors.
Section 250.859
Firefighting systems.
Section 250.860
Chemical firefighting system.
Section 250.861
Foam firefighting systems.
Section 250.862
Fire and gas-detection systems.
Section 250.863
Electrical equipment.
Section 250.864
Erosion.
Section 250.865
Surface pumps.
Section 250.866
Personnel safety equipment.
Section 250.867
Temporary quarters and temporary equipment.
Section 250.868
Non-metallic piping.
Section 250.869
General platform operations.
Section 250.870
Time delays on pressure safety low (PSL) sensors.
Section 250.871
Welding and burning practices and procedures.
Section 250.872
Atmospheric vessels.
Section 250.873
Subsea gas lift requirements.
Section 250.874
Subsea water injection systems.
Section 250.875
Subsea pump systems.
Section 250.876
Fired and exhaust heated components.
Section 250.877-250.879
§§ 250.877-250.879 [Reserved]
Section 250.880
Production safety system testing.
Section 250.881-250.889
§§ 250.881-250.889 [Reserved]
Section 250.890
Records.
Section 250.891
Safety device training.
Section 250.892-250.899
§§ 250.892-250.899 [Reserved]
Section 250.900
What general requirements apply to all platforms?
Section 250.901
What industry standards must your platform meet?
Section 250.902
What are the requirements for platform removal and location clearance?
Section 250.903
What records must I keep?
Section 250.904
What is the Platform Approval Program?
Section 250.905
How do I get approval for the installation, modification, or repair of my platform?
Section 250.906
What must I do to obtain approval for the proposed site of my platform?
Section 250.907
Where must I locate foundation boreholes?
Section 250.908
What are the minimum structural fatigue design requirements?
Section 250.909
What is the Platform Verification Program?
Section 250.910
Which of my facilities are subject to the Platform Verification Program?
Section 250.911
If my platform is subject to the Platform Verification Program, what must I do?
Section 250.912
What plans must I submit under the Platform Verification Program?
Section 250.913
When must I resubmit Platform Verification Program plans?
Section 250.914
How do I nominate a CVA?
Section 250.915
What are the CVA's primary responsibilities?
Section 250.916
What are the CVA's primary duties during the design phase?
Section 250.917
What are the CVA's primary duties during the fabrication phase?
Section 250.918
What are the CVA's primary duties during the installation phase?
Section 250.919
What in-service inspection requirements must I meet?
Section 250.920
What are the BSEE requirements for assessment of fixed platforms?
Section 250.921
How do I analyze my platform for cumulative fatigue?
Section 250.1000
General requirements.
Section 250.1001
Definitions.
Section 250.1002
Design requirements for DOI pipelines.
Section 250.1003
Installation, testing, and repair requirements for DOI pipelines.
Section 250.1004
Safety equipment requirements for DOI pipelines.
Section 250.1005
Inspection requirements for DOI pipelines.
Section 250.1006
How must I decommission and take out of service a DOI pipeline?
Section 250.1007
What to include in applications.
Section 250.1008
Reports.
Section 250.1009
Requirements to obtain pipeline right-of-way grants.
Section 250.1010
General requirements for pipeline right-of-way holders.
Section 250.1011
[Reserved]
Section 250.1012
Required payments for pipeline right-of-way holders.
Section 250.1013
Grounds for forfeiture of pipeline right-of-way grants.
Section 250.1014
When pipeline right-of-way grants expire.
Section 250.1015
Applications for pipeline right-of-way grants.
Section 250.1016
Granting pipeline rights-of-way.
Section 250.1017
Requirements for construction under pipeline right-of-way grants.
Section 250.1018
Assignment of pipeline right-of-way grants.
Section 250.1019
Relinquishment of pipeline right-of-way grants.
Section 250.1150
What are the general reservoir production requirements?
Section 250.1151
How often must I conduct well production tests?
Section 250.1152
How do I conduct well tests?
Section 250.1153-250.1155
§§ 250.1153-250.1155 [Reserved]
Section 250.1156
What steps must I take to receive approval to produce within 500 feet of a unit or lease line?
Section 250.1157
How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap?
Section 250.1158
How do I receive approval to downhole commingle hydrocarbons?
Section 250.1159
May the Regional Supervisor limit my well or reservoir production rates?
Section 250.1160
When may I flare or vent gas?
Section 250.1161
When may I flare or vent gas for extended periods of time?
Section 250.1162
When may I burn produced liquid hydrocarbons?
Section 250.1163
How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes, and what records must I maintain?
Section 250.1164
What are the requirements for flaring or venting gas containing HS?
Section 250.1165
What must I do for enhanced recovery operations?
Section 250.1166
What additional reporting is required for developments in the Alaska OCS Region?
Section 250.1167
What information must I submit with forms and for approvals?
Section 250.1200
Question index table.
Section 250.1201
Definitions.
Section 250.1202
Liquid hydrocarbon measurement.
Section 250.1203
Gas measurement.
Section 250.1204
Surface commingling.
Section 250.1205
Site security.
Section 250.1300
What is the purpose of this subpart?
Section 250.1301
What are the requirements for unitization?
Section 250.1302
What if I have a competitive reservoir on a lease?
Section 250.1303
How do I apply for voluntary unitization?
Section 250.1304
How will BSEE require unitization?
Section 250.1400
How does BSEE begin the civil penalty process?
Section 250.1401
[Reserved]
Section 250.1402
Definitions.
Section 250.1403
What is the maximum civil penalty?
Section 250.1404
Which violations will BSEE review for potential civil penalties?
Section 250.1405
When is a case file developed?
Section 250.1406
When will BSEE notify me and provide penalty information?
Section 250.1407
How do I respond to the letter of notification?
Section 250.1408
When will I be notified of the Reviewing Officer's decision?
Section 250.1409
What are my appeal rights?
Section 250.1450
What definitions apply to this subpart?
Section 250.1451
What may BSEE do if I violate a statute, regulation, order, or lease term relating to a Federal oil and gas lease?
Section 250.1452
What if I correct the violation?
Section 250.1453
What if I do not correct the violation?
Section 250.1454
How may I request a hearing on the record on a Notice of Noncompliance?
Section 250.1455
Does my request for a hearing on the record affect the penalties?
Section 250.1456
May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance?
Section 250.1460
May I be subject to penalties without prior notice and an opportunity to correct?
Section 250.1461
How will BSEE inform me of violations without a period to correct?
Section 250.1462
How may I request a hearing on the record on a Notice of Noncompliance regarding violations without a period to correct?
Section 250.1463
Does my request for a hearing on the record affect the penalties?
Section 250.1464
May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance?
Section 250.1470
How does BSEE decide what the amount of the penalty should be?
Section 250.1471
Does the penalty affect whether I owe interest?
Section 250.1472
How will the Office of Hearings and Appeals conduct the hearing on the record?
Section 250.1473
How may I appeal the Administrative Law Judge's decision?
Section 250.1474
May I seek judicial review of the decision of the Interior Board of Land Appeals?
Section 250.1475
When must I pay the penalty?
Section 250.1476
Can BSEE reduce my penalty once it is assessed?
Section 250.1477
How may BSEE collect the penalty?
Section 250.1480
May the United States criminally prosecute me for violations under Federal oil and gas leases?
Section 250.1500
Definitions.
Section 250.1501
What is the goal of my training program?
Section 250.1503
What are my general responsibilities for training?
Section 250.1504
May I use alternative training methods?
Section 250.1505
Where may I get training for my employees?
Section 250.1506
How often must I train my employees?
Section 250.1507
How will BSEE measure training results?
Section 250.1508
What must I do when BSEE administers written or oral tests?
Section 250.1509
What must I do when BSEE administers or requires hands-on, simulator, or other types of testing?
Section 250.1510
What will BSEE do if my training program does not comply with this subpart?
Section 250.1600
Performance standard.
Section 250.1601-250.1634
[Reserved]
Section 250.1700
What do the terms “decommissioning,” “obstructions,” “facility,” and “predecessor” mean in this subpart?
Section 250.1701
Who must meet the decommissioning obligations in this subpart?
Section 250.1702
When do I accrue decommissioning obligations?
Section 250.1703
What are the general requirements for decommissioning?
Section 250.1704
What decommissioning applications and reports must I submit and when must I submit them?
Section 250.1705-250.1707
§§ 250.1705-250.1707 [Reserved]
Section 250.1708
How will BSEE enforce accrued decommissioning obligations against predecessors?
Section 250.1709
[Reserved]
Section 250.1710
When must I permanently plug all wells on a lease?
Section 250.1711
When will BSEE order me to permanently plug a well?
Section 250.1712
What information must I submit before I permanently plug a well or zone?
Section 250.1713
[Reserved]
Section 250.1714
What must I accomplish with well plugs?
Section 250.1715
How must I permanently plug a well?
Section 250.1716
To what depth must I remove wellheads and casings?
Section 250.1717
[Reserved]
Section 250.1721
If I temporarily abandon a well that I plan to re-enter, what must I do?
Section 250.1722
If I install a subsea protective device, what requirements must I meet?
Section 250.1723
What must I do when it is no longer necessary to maintain a well in temporary abandoned status?
Section 250.1725
When do I have to remove platforms and other facilities?
Section 250.1726
When must I submit an initial platform removal application and what must it include?
Section 250.1727
What information must I include in my final application to remove a platform or other facility?
Section 250.1728
To what depth must I remove a platform or other facility?
Section 250.1729
After I remove a platform or other facility, what information must I submit?
Section 250.1730
When might BSEE approve partial structure removal or toppling in place?
Section 250.1731
Who is responsible for decommissioning an OCS facility subject to an Alternate Use RUE?
Section 250.1740
How must I verify that the site of a permanently plugged well, removed platform, or other removed facility is clear of obstructions?
Section 250.1741
If I drag a trawl across a site, what requirements must I meet?
Section 250.1742
What other methods can I use to verify that a site is clear?
Section 250.1743
How do I certify that a site is clear of obstructions?
Section 250.1750
When may I decommission a pipeline in place?
Section 250.1751
How do I decommission a pipeline in place?
Section 250.1752
How do I remove a pipeline?
Section 250.1753
After I decommission a pipeline, what information must I submit?
Section 250.1754
When must I remove a pipeline decommissioned in place?
Section 250.1900
Must I have a SEMS program?
Section 250.1901
What is the goal of my SEMS program?
Section 250.1902
What must I include in my SEMS program?
Section 250.1903
Acronyms and definitions.
Section 250.1904
Special instructions.
Section 250.1905-250.1908
§§ 250.1905-250.1908 [Reserved]
Section 250.1909
What are management's general responsibilities for the SEMS program?
Section 250.1910
What safety and environmental information is required?
Section 250.1911
What hazards analysis criteria must my SEMS program meet?
Section 250.1912
What criteria for management of change must my SEMS program meet?
Section 250.1913
What criteria for operating procedures must my SEMS program meet?
Section 250.1914
What criteria must be documented in my SEMS program for safe work practices and contractor selection?
Section 250.1915
What training criteria must be in my SEMS program?
Section 250.1916
What criteria for mechanical integrity must my SEMS program meet?
Section 250.1917
What criteria for pre-startup review must be in my SEMS program?
Section 250.1918
What criteria for emergency response and control must be in my SEMS program?
Section 250.1919
What criteria for investigation of incidents must be in my SEMS program?
Section 250.1920
What are the auditing requirements for my SEMS program?
Section 250.1921
What qualifications must the ASP meet?
Section 250.1922
What qualifications must an AB meet?
Section 250.1923
[Reserved]
Section 250.1924
How will BSEE determine if my SEMS program is effective?
Section 250.1925
May BSEE direct me to conduct additional audits?
Section 250.1926
[Reserved]
Section 250.1927
What happens if BSEE finds shortcomings in my SEMS program?
Section 250.1928
What are my recordkeeping and documentation requirements?
Section 250.1929
What are my responsibilities for submitting OCS performance measure data?
Section 250.1930
What must be included in my SEMS program for SWA?
Section 250.1931
What must be included in my SEMS program for UWA?
Section 250.1932
What are my EPP requirements?
Section 250.1933
What procedures must be included for reporting unsafe working conditions?