Skip to content
LexBuild

30 CFR § 250.735 - What associated systems and related equipment must all BOP systems include?

---
identifier: "/us/cfr/t30/s250.735"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "30 CFR § 250.735 - What associated systems and related equipment must all BOP systems include?"
title_number: 30
title_name: "Mineral Resources"
section_number: "250.735"
section_name: "What associated systems and related equipment must all BOP systems include?"
chapter_name: "BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR"
subchapter_number: "B"
subchapter_name: "OFFSHORE"
part_number: "250"
part_name: "OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF"
positive_law: false
currency: "2026-04-05"
last_updated: "2026-04-05"
format_version: "1.1.0"
generator: "[email protected]"
authority: "30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334."
regulatory_source: "76 FR 64462, Oct. 18, 2011, unless otherwise noted."
cfr_part: "250"
---

# 250.735 What associated systems and related equipment must all BOP systems include?

All BOP systems must include the following associated systems and related equipment:

(a) An accumulator system (as specified in API Standard 53, incorporated by reference in § 250.198). Your accumulator system must have the fluid volume capacity and appropriate pre-charge pressures in accordance with API Standard 53. If you supply the accumulator regulators by rig air and do not have a secondary source of pneumatic supply, you must equip the regulators with manual overrides or other devices to ensure capability of hydraulic operations if rig air is lost;

(b) An automatic backup to the primary accumulator-charging system. The power source must be independent from the power source for the primary accumulator-charging system. The independent power source must possess sufficient capability to close and hold closed all BOP components under MASP conditions as defined for the operation;

(c) At least two full BOP control stations. One station must be on the rig floor. You must locate the other station in a readily accessible location away from the rig floor;

(d) The choke line(s) installed above the bottom well-control ram;

(e) The kill line must be installed beneath at least one well-control ram, and may be installed below the bottom ram;

(f) A fill-up line above the uppermost BOP;

(g) Locking devices for all BOP sealing rams (*i.e.*, blind shear rams, pipe rams and variable bore rams), as follows:

(1) For subsea BOPs, hydraulic locking devices must be installed on all sealing rams;

(2) For surface BOPs:

(i) Remotely-operated locking devices must be installed on blind shear rams no later than April 29, 2019;

(ii) Manual or remotely-operated locking devices must be installed on pipe rams and variable bore rams; and

(h) A wellhead assembly with a RWP that exceeds the maximum anticipated wellhead pressure.

[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21981, May 15, 2019]