Skip to content
LexBuild

46 CFR § 162.050-13 - Factory production and inspection.

---
identifier: "/us/cfr/t46/s162.050-13"
source: "ecfr"
legal_status: "authoritative_unofficial"
title: "46 CFR § 162.050-13 - Factory production and inspection."
title_number: 46
title_name: "Shipping"
section_number: "162.050-13"
section_name: "Factory production and inspection."
chapter_name: "COAST GUARD, DEPARTMENT OF HOMELAND SECURITY"
subchapter_number: "Q"
subchapter_name: "EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL"
part_number: "162"
part_name: "ENGINEERING EQUIPMENT"
positive_law: false
currency: "2026-03-24"
last_updated: "2026-03-24"
format_version: "1.1.0"
generator: "[email protected]"
authority: "33 U.S.C. 1321(j), 1903; 46 U.S.C. 3306, 3703, 4104, 4302; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; DHS Delegation 00170.1, Revision No. 01.4."
cfr_part: "162"
---

# 162.050-13 Factory production and inspection.

(a) Equipment manufactured under Coast Guard approval must be of the type described in the current certificate of approval issued for the equipment.

(b) Equipment manufactured under Coast Guard approval is not inspected on a regular schedule at the place of manufacture. However, the Commanding Officer, USCG Marine Safety Center, may detail Coast Guard personnel at any time to visit a factory where the equipment is manufactured to conduct an inspection of the manufacturing process.

[44 FR 53359, Sept. 13, 1979, as amended by USCG-2001-10224, 66 FR 48621, Sept. 21, 2001]